Design Space was contracted to provide over 10,000 square feet of field office space for a three and half year structural retrofit project at Folsom Dam. The project consisted of (3) 36×60 buildings, (1) 38×64 building, (1) 24×60 building, and a restroom trailer. Design Space modified, delivered, and installed the buildings in 45 days to meet the Owner and General Contractor’s tight schedule. Due to space constraints the buildings were aligned along the access road to the job site. Another project from vision to reality, on time and on budget.
Monthly Archives: April 2014
Design Space is providing construction trailers for Jehovah’s Witness new Hall
Design Space Modular Buildings is providing the construction trailers for the site a of a new Jehovah’s Witness hall. The site was confined so offices needed to be broken up in separate mobile offices, rather than one large modular complex. Using a string of 10×44 mobile offices worked perfectly for this site.